A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
Scope of the Report:
A data center is used to house an enterprise IT infrastructure. They constitute the backbone of essential business operations. The demand for cloud-based services is increasing among enterprises including many Fortune 500 companies. Several industries are making use of advanced technologies to gain a competitive advantage. The complexities associated with business applications have increased because of the enormous growth in data volumes. This has triggered a greater need for construction and renovation of data centers. Enterprises are focusing on constructing green data centers to reduce power consumption and environmental impact. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications also play a vital role in the building of data center facilities.
Internet of things (IoT), which requires a data center, is experiencing tremendous growth. Data centers are more suitable for storing and processing data generated by devices connected to the internet, and also to meet the demand for real-time computing. Therefore, the market is set to witness an increase in data centers that are reliable and scalable in nature. The growing demand for cloud computing and big data analytics are also assumed to have an impact on this market, thereby driving the growth of the Latin America Data Center Construction market during the forecast period.
The global Data Center Construction market is valued at xx million USD in 2018 and is expected to reach xx million USD by the end of 2024, growing at a CAGR of xx% between 2019 and 2024.
The Asia-Pacific will occupy for more market share in following years, especially in China, also fast growing India and Southeast Asia regions.
North America, especially The United States, will still play an important role which cannot be ignored. Any changes from United States might affect the development trend of Data Center Construction.
Europe also play important roles in global market, with market size of xx million USD in 2019 and will be xx million USD in 2024, with a CAGR of xx%.
This report studies the Data Center Construction market status and outlook of Global and major regions, from angles of players, countries, product types and end industries; this report analyzes the top players in global market, and splits the Data Center Construction market by product type and applications/end industries.
Market Segment by Companies, this report covers
Aceco TI
AECOM
Turner Construction
Equinix
Fluor
DPR Construction
Constructora Sudamericana S.A.
Market Segment by Regions, regional analysis covers
North America (United States, Canada and Mexico)
Europe (Germany, France, UK, Russia and Italy)
Asia-Pacific (China, Japan, Korea, India and Southeast Asia)
South America (Brazil, Argentina, Colombia)
Middle East and Africa (Saudi Arabia, UAE, Egypt, Nigeria and South Africa)
Market Segment by Type, covers
Electrical Construction
Mechanical Construction
General Construction
Market Segment by Applications, can be divided into
Finance
Internet
Telecommunications
Government
Others
Table of Contents
1 Data Center Construction Market Overview
1.1 Product Overview and Scope of Data Center Construction
1.2 Classification of Data Center Construction by Types
1.2.1 Global Data Center Construction Revenue Comparison by Types (2019-2024)
1.2.2 Global Data Center Construction Revenue Market Share by Types in 2018
1.2.3 Electrical Construction
1.2.4 Mechanical Construction
1.2.5 General Construction
1.3 Global Data Center Construction Market by Application
1.3.1 Global Data Center Construction Market Size and Market Share Comparison by Applications (2014-2024)
1.3.2 Finance
1.3.3 Internet
1.3.4 Telecommunications
1.3.5 Government
1.3.6 Others
1.4 Global Data Center Construction Market by Regions
1.4.1 Global Data Center Construction Market Size (Million USD) Comparison by Regions (2014-2024)
1.4.1 North America (USA, Canada and Mexico) Data Center Construction Status and Prospect (2014-2024)
1.4.2 Europe (Germany, France, UK, Russia and Italy) Data Center Construction Status and Prospect (2014-2024)
1.4.3 Asia-Pacific (China, Japan, Korea, India and Southeast Asia) Data Center Construction Status and Prospect (2014-2024)
1.4.4 South America (Brazil, Argentina, Colombia) Data Center Construction Status and Prospect (2014-2024)
1.4.5 Middle East and Africa (Saudi Arabia, UAE, Egypt, Nigeria and South Africa) Data Center Construction Status and Prospect (2014-2024)
1.5 Global Market Size of Data Center Construction (2014-2024)
2 Manufacturers Profiles
2.1 Aceco TI
2.1.1 Business Overview
2.1.2 Data Center Construction Type and Applications
2.1.2.1 Product A
2.1.2.2 Product B
2.1.3 Aceco TI Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
2.2 AECOM
2.2.1 Business Overview
2.2.2 Data Center Construction Type and Applications
2.2.2.1 Product A
2.2.2.2 Product B
2.2.3 AECOM Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
2.3 Turner Construction
2.3.1 Business Overview
2.3.2 Data Center Construction Type and Applications
2.3.2.1 Product A
2.3.2.2 Product B
2.3.3 Turner Construction Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
2.4 Equinix
2.4.1 Business Overview
2.4.2 Data Center Construction Type and Applications
2.4.2.1 Product A
2.4.2.2 Product B
2.4.3 Equinix Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
2.5 Fluor
2.5.1 Business Overview
2.5.2 Data Center Construction Type and Applications
2.5.2.1 Product A
2.5.2.2 Product B
2.5.3 Fluor Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
2.6 DPR Construction
2.6.1 Business Overview
2.6.2 Data Center Construction Type and Applications
2.6.2.1 Product A
2.6.2.2 Product B
2.6.3 DPR Construction Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
2.7 Constructora Sudamericana S.A.
2.7.1 Business Overview
2.7.2 Data Center Construction Type and Applications
2.7.2.1 Product A
2.7.2.2 Product B
2.7.3 Constructora Sudamericana S.A. Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
3 Global Data Center Construction Market Competition, by Players
3.1 Global Data Center Construction Revenue and Share by Players (2014-2019)
3.2 Market Concentration Rate
3.2.1 Top 5 Data Center Construction Players Market Share
3.2.2 Top 10 Data Center Construction Players Market Share
3.3 Market Competition Trend
4 Global Data Center Construction Market Size by Regions
4.1 Global Data Center Construction Revenue and Market Share by Regions
4.2 North America Data Center Construction Revenue and Growth Rate (2014-2019)
4.3 Europe Data Center Construction Revenue and Growth Rate (2014-2019)
4.4 Asia-Pacific Data Center Construction Revenue and Growth Rate (2014-2019)
4.5 South America Data Center Construction Revenue and Growth Rate (2014-2019)
4.6 Middle East and Africa Data Center Construction Revenue and Growth Rate (2014-2019)
5 North America Data Center Construction Revenue by Countries
5.1 North America Data Center Construction Revenue by Countries (2014-2019)
5.2 USA Data Center Construction Revenue and Growth Rate (2014-2019)
5.3 Canada Data Center Construction Revenue and Growth Rate (2014-2019)
5.4 Mexico Data Center Construction Revenue and Growth Rate (2014-2019)
6 Europe Data Center Construction Revenue by Countries
6.1 Europe Data Center Construction Revenue by Countries (2014-2019)
6.2 Germany Data Center Construction Revenue and Growth Rate (2014-2019)
6.3 UK Data Center Construction Revenue and Growth Rate (2014-2019)
6.4 France Data Center Construction Revenue and Growth Rate (2014-2019)
6.5 Russia Data Center Construction Revenue and Growth Rate (2014-2019)
6.6 Italy Data Center Construction Revenue and Growth Rate (2014-2019)
7 Asia-Pacific Data Center Construction Revenue by Countries
7.1 Asia-Pacific Data Center Construction Revenue by Countries (2014-2019)
7.2 China Data Center Construction Revenue and Growth Rate (2014-2019)
7.3 Japan Data Center Construction Revenue and Growth Rate (2014-2019)
7.4 Korea Data Center Construction Revenue and Growth Rate (2014-2019)
7.5 India Data Center Construction Revenue and Growth Rate (2014-2019)
7.6 Southeast Asia Data Center Construction Revenue and Growth Rate (2014-2019)
8 South America Data Center Construction Revenue by Countries
8.1 South America Data Center Construction Revenue by Countries (2014-2019)
8.2 Brazil Data Center Construction Revenue and Growth Rate (2014-2019)
8.3 Argentina Data Center Construction Revenue and Growth Rate (2014-2019)
8.4 Colombia Data Center Construction Revenue and Growth Rate (2014-2019)
9 Middle East and Africa Revenue Data Center Construction by Countries
9.1 Middle East and Africa Data Center Construction Revenue by Countries (2014-2019)
9.2 Saudi Arabia Data Center Construction Revenue and Growth Rate (2014-2019)
9.3 UAE Data Center Construction Revenue and Growth Rate (2014-2019)
9.4 Egypt Data Center Construction Revenue and Growth Rate (2014-2019)
9.5 Nigeria Data Center Construction Revenue and Growth Rate (2014-2019)
9.6 South Africa Data Center Construction Revenue and Growth Rate (2014-2019)
10 Global Data Center Construction Market Segment by Type
10.1 Global Data Center Construction Revenue and Market Share by Type (2014-2019)
10.2 Global Data Center Construction Market Forecast by Type (2019-2024)
10.3 Electrical Construction Revenue Growth Rate (2014-2024)
10.4 Mechanical Construction Revenue Growth Rate (2014-2024)
10.5 General Construction Revenue Growth Rate (2014-2024)
11 Global Data Center Construction Market Segment by Application
11.1 Global Data Center Construction Revenue Market Share by Application (2014-2019)
11.2 Data Center Construction Market Forecast by Application (2019-2024)
11.3 Finance Revenue Growth (2014-2019)
11.4 Internet Revenue Growth (2014-2019)
11.5 Telecommunications Revenue Growth (2014-2019)
11.6 Government Revenue Growth (2014-2019)
11.7 Others Revenue Growth (2014-2019)
12 Global Data Center Construction Market Size Forecast (2019-2024)
12.1 Global Data Center Construction Market Size Forecast (2019-2024)
12.2 Global Data Center Construction Market Forecast by Regions (2019-2024)
12.3 North America Data Center Construction Revenue Market Forecast (2019-2024)
12.4 Europe Data Center Construction Revenue Market Forecast (2019-2024)
12.5 Asia-Pacific Data Center Construction Revenue Market Forecast (2019-2024)
12.6 South America Data Center Construction Revenue Market Forecast (2019-2024)
12.7 Middle East and Africa Data Center Construction Revenue Market Forecast (2019-2024)
13 Research Findings and Conclusion
14 Appendix
14.1 Methodology
14.2 Data Source
List of Tables and Figures
Figure Data Center Construction Picture
Table Product Specifications of Data Center Construction
Table Global Data Center Construction and Revenue (Million USD) Market Split by Product Type
Figure Global Data Center Construction Revenue Market Share by Types in 2018
Figure Electrical Construction Picture
Figure Mechanical Construction Picture
Figure General Construction Picture
Table Global Data Center Construction Revenue (Million USD) by Application (2014-2024)
Figure Data Center Construction Revenue Market Share by Applications in 2018
Figure Finance Picture
Figure Internet Picture
Figure Telecommunications Picture
Figure Government Picture
Figure Others Picture
Table Global Market Data Center Construction Revenue (Million USD) Comparison by Regions 2014-2024
Figure North America Data Center Construction Revenue (Million USD) and Growth Rate (2014-2024)
Figure Europe Data Center Construction Revenue (Million USD) and Growth Rate (2014-2024)
Figure Asia-Pacific Data Center Construction Revenue (Million USD) and Growth Rate (2014-2024)
Figure South America Data Center Construction Revenue (Million USD) and Growth Rate (2014-2024)
Figure Middle East and Africa Data Center Construction Revenue (Million USD) and Growth Rate (2014-2024)
Figure Global Data Center Construction Revenue (Million USD) and Growth Rate (2014-2024)
Table Aceco TI Basic Information, Manufacturing Base and Competitors
Table Aceco TI Data Center Construction Type and Applications
Table Aceco TI Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
Table AECOM Basic Information, Manufacturing Base and Competitors
Table AECOM Data Center Construction Type and Applications
Table AECOM Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
Table Turner Construction Basic Information, Manufacturing Base and Competitors
Table Turner Construction Data Center Construction Type and Applications
Table Turner Construction Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
Table Equinix Basic Information, Manufacturing Base and Competitors
Table Equinix Data Center Construction Type and Applications
Table Equinix Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
Table Fluor Basic Information, Manufacturing Base and Competitors
Table Fluor Data Center Construction Type and Applications
Table Fluor Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
Table DPR Construction Basic Information, Manufacturing Base and Competitors
Table DPR Construction Data Center Construction Type and Applications
Table DPR Construction Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
Table Constructora Sudamericana S.A. Basic Information, Manufacturing Base and Competitors
Table Constructora Sudamericana S.A. Data Center Construction Type and Applications
Table Constructora Sudamericana S.A. Data Center Construction Revenue, Gross Margin and Market Share (2017-2018)
Table Global Data Center Construction Revenue (Million USD) by Players (2014-2019)
Table Global Data Center Construction Revenue Share by Players (2014-2019)
Figure Global Data Center Construction Revenue Share by Players in 2017
Figure Global Data Center Construction Revenue Share by Players in 2018
Figure Global Top 5 Players Data Center Construction Revenue Market Share in 2018
Figure Global Top 10 Players Data Center Construction Revenue Market Share in 2018
Figure Global Data Center Construction Revenue (Million USD) and Growth Rate (%) (2014-2019)
Table Global Data Center Construction Revenue (Million USD) by Regions (2014-2019)
Table Global Data Center Construction Revenue Market Share by Regions (2014-2019)
Figure Global Data Center Construction Revenue Market Share by Regions (2014-2019)
Figure Global Data Center Construction Revenue Market Share by Regions in 2018
Figure North America Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Europe Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Asia-Pacific Data Center Construction Revenue and Growth Rate (2014-2019)
Figure South America Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Middle East and Africa Data Center Construction Revenue and Growth Rate (2014-2019)
Table North America Data Center Construction Revenue by Countries (2014-2019)
Table North America Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure North America Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure North America Data Center Construction Revenue Market Share by Countries in 2018
Figure USA Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Canada Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Mexico Data Center Construction Revenue and Growth Rate (2014-2019)
Table Europe Data Center Construction Revenue (Million USD) by Countries (2014-2019)
Figure Europe Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure Europe Data Center Construction Revenue Market Share by Countries in 2018
Figure Germany Data Center Construction Revenue and Growth Rate (2014-2019)
Figure UK Data Center Construction Revenue and Growth Rate (2014-2019)
Figure France Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Russia Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Italy Data Center Construction Revenue and Growth Rate (2014-2019)
Table Asia-Pacific Data Center Construction Revenue (Million USD) by Countries (2014-2019)
Figure Asia-Pacific Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure Asia-Pacific Data Center Construction Revenue Market Share by Countries in 2018
Figure China Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Japan Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Korea Data Center Construction Revenue and Growth Rate (2014-2019)
Figure India Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Southeast Asia Data Center Construction Revenue and Growth Rate (2014-2019)
Table South America Data Center Construction Revenue by Countries (2014-2019)
Table South America Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure South America Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure South America Data Center Construction Revenue Market Share by Countries in 2018
Figure Brazil Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Argentina Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Colombia Data Center Construction Revenue and Growth Rate (2014-2019)
Table Middle East and Africa Data Center Construction Revenue (Million USD) by Countries (2014-2019)
Table Middle East and Africa Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure Middle East and Africa Data Center Construction Revenue Market Share by Countries (2014-2019)
Figure Middle East and Africa Data Center Construction Revenue Market Share by Countries in 2018
Figure Saudi Arabia Data Center Construction Revenue and Growth Rate (2014-2019)
Figure UAE Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Egypt Data Center Construction Revenue and Growth Rate (2014-2019)
Figure Nigeria Data Center Construction Revenue and Growth Rate (2014-2019)
Figure South Africa Data Center Construction Revenue and Growth Rate (2014-2019)
Table Global Data Center Construction Revenue (Million USD) by Type (2014-2019)
Table Global Data Center Construction Revenue Share by Type (2014-2019)
Figure Global Data Center Construction Revenue Share by Type (2014-2019)
Figure Global Data Center Construction Revenue Share by Type in 2019
Table Global Data Center Construction Revenue Forecast by Type (2019-2024)
Figure Global Data Center Construction Market Share Forecast by Type (2019-2024)
Figure Global Electrical Construction Revenue Growth Rate (2014-2019)
Figure Global Mechanical Construction Revenue Growth Rate (2014-2019)
Figure Global General Construction Revenue Growth Rate (2014-2019)
Table Global Data Center Construction Revenue by Application (2014-2019)
Table Global Data Center Construction Revenue Share by Application (2014-2019)
Figure Global Data Center Construction Revenue Share by Application (2014-2019)
Figure Global Data Center Construction Revenue Share by Application in 2019
Table Global Data Center Construction Revenue Forecast by Application (2019-2024)
Figure Global Data Center Construction Market Share Forecast by Application (2019-2024)
Figure Global Finance Revenue Growth Rate (2014-2019)
Figure Global Internet Revenue Growth Rate (2014-2019)
Figure Global Telecommunications Revenue Growth Rate (2014-2019)
Figure Global Government Revenue Growth Rate (2014-2019)
Figure Global Others Revenue Growth Rate (2014-2019)
Figure Global Data Center Construction Revenue (Million USD) and Growth Rate Forecast (2019-2024)
Table Global Data Center Construction Revenue (Million USD) Forecast by Regions (2019-2024)
Figure Global Data Center Construction Revenue Market Share Forecast by Regions (2019-2024)
Figure North America Data Center Construction Revenue Market Forecast (2019-2024)
Figure Europe Data Center Construction Revenue Market Forecast (2019-2024)
Figure Asia-Pacific Data Center Construction Revenue Market Forecast (2019-2024)
Figure South America Data Center Construction Revenue Market Forecast (2019-2024)
Figure Middle East and Africa Data Center Construction Revenue Market Forecast (2019-2024)
| Price : US$ 3500 |
Date : Oct 2026 |
| Category : Telecom and IT |
Pages : 191 |
| Price : US$ 3500 |
Date : Oct 2026 |
| Category : Telecom and IT |
Pages : 206 |
| Price : US$ 3500 |
Date : Oct 2026 |
| Category : Telecom and IT |
Pages : 188 |
| Price : US$ 3500 |
Date : Oct 2026 |
| Category : Telecom and IT |
Pages : 186 |