Summary
A data center is a facility used to house computer systems and associated components, such as Telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
This report includes market status and forecast of global and major regions, with introduction of vendors, regions, product types and end industries; and this report counts product types and end industries in global and major regions.
The report includes as follows:
The report provides current data, historical overview and future forecast.
The report includes an in-depth analysis of the Global market for Data Center Construction , covering Global total and major region markets.
The data of 2017-2025 are included. All-inclusive market are given through data on sales, consumption, and prices (Global total and by major regions).
The report provides introduction of leading Global manufacturers.
Data Center Construction market prospects to 2025 are included (in sales, consumption and price).
Market Segment as follows:
By Region / Countries
North America (U.S., Canada, Mexico)
Europe (Germany, U.K., France, Italy, Russia, Spain etc)
Asia-Pacific (China, India, Japan, Southeast Asia etc)
South America (Brazil, Argentina etc)
Middle East & Africa (Saudi Arabia, South Africa etc)
By Type
Electrical Construction
Mechanical Construction
General Construction
By End-User / Application
UPS
Energy storage
Generators
Transfer switches and switchgear
Others
By Company
AECOM
Arup Group
Corgan Associates
DPR Construction
Fluor
HDR Architecture
Holder Construction Group
ISG Construction
Jacobs Engineering Group
Jones Engineering
Nakano Corporation
Schneider Electric
SISK Group
Sweett Group
Turner Construction
Table of Contents
Part 1 Market Definition
1.1 Market Segment Overview
Figure Global Data Center Construction Market Size (Million USD) 2017-2025
1.2 by Type
Table Global Data Center Construction Market and Growth by Type
1.3 by End-Use / Application
Table Global Data Center Construction Market and Growth by End-Use / Application
2 Global Market by Vendors
2.1 Market Share
Table Global Data Center Construction Revenue (Million USD) by Vendors (2017-2019)
Table Global Data Center Construction Revenue Share by Vendors (2017-2019)
Table Global Data Center Construction Market Volume () by Vendors (2017-2019)
Table Global Data Center Construction Market Volume Share by Vendors (2017-2019)
2.2 Vendor Profile
Table Headquarter, Factories & Sales Regions Comparison of Vendors
Table Product List of Vendors
2.3 Dynamic of Vendors
3 Global Market by Type
3.1 Market Share
Table Global Data Center Construction Market (Million USD) by Type (2017-2019)
Table Global Data Center Construction Market Share by Type (2017-2019)
Table Global Data Center Construction Market Volume () by Type (2017-2019)
Table Global Data Center Construction Market Volume Share by Type (2017-2019)
3.2 Introduction of End-Use by Different Products
4 Global Market by End-Use / Application
4.1 Market Share
Table Global Data Center Construction Market (Million USD) by End-Use / Application (2017-2019)
Table Global Data Center Construction Market Share by End-Use / Application (2017-2019)
Table Global Data Center Construction Market Volume () by End-Use / Application (2017-2019)
Table Global Data Center Construction Market Volume Share by End-Use / Application (2017-2019)
4.2 Overview of Consumption Characteristics
4.2.1 Preference Driven
4.2.2 Substitutability
4.2.3 Influence by Strategy
4.2.4 Professional Needs
5 Global Market by Regions
5.1 Market Share
Table Global Data Center Construction Market (Million USD) by Regions (2017-2019)
Table Global Data Center Construction Market Share by Regions (2017-2019)
Table Global Data Center Construction Market Volume () by Regions (2017-2019)
Table Global Data Center Construction Market Volume Share by Regions (2017-2019)
5.2 Regional Market Growth
5.2.1 North America
Figure North America Market Growth 2015-2018
5.2.2 Europe
Figure Europe Market Growth 2017-2019
5.2.3 Asia-Pacific
Figure Asia-Pacific Market Growth 2017-2019
5.2.4 South America
Figure South America Market Growth 2017-2019
5.2.5 Middle East & Africa
Figure Middle East & Africa Market Growth 2017-2019
6 North America Market
6.1 by Type
Table North America Data Center Construction Market (Million USD) by Type (2017-2019)
Table North America Data Center Construction Market Share by Type (2017-2019)
6.2 by End-Use / Application
Table North America Data Center Construction Market (Million USD) by End-Use / Application (2017-2019)
Table North America Data Center Construction Market Share by End-Use / Application (2017-2019)
6.3 by Regions
Table North America Data Center Construction Market (Million USD) by Regions (2017-2019)
Table North America Data Center Construction Market Share by Regions (2017-2019)
7 Europe Market
7.1 by Type
Table Europe Data Center Construction Market (Million USD) by Type (2017-2019)
Table Europe Data Center Construction Market Share by Type (2017-2019)
7.2 by End-Use / Application
Table Europe Data Center Construction Market (Million USD) by End-Use / Application (2017-2019)
Table Europe Data Center Construction Market Share by End-Use / Application (2017-2019)
7.3 by Regions
Table Europe Data Center Construction Market (Million USD) by Regions (2017-2019)
Table Europe Data Center Construction Market Share by Regions (2017-2019)
8 Asia-Pacific Market
8.1 by Type
Table Asia-Pacific Data Center Construction Market (Million USD) by Type (2017-2019)
Table Asia-Pacific Data Center Construction Market Share by Type (2017-2019)
8.2 by End-Use / Application
Table Asia-Pacific Data Center Construction Market (Million USD) by End-Use / Application (2017-2019)
Table Asia-Pacific Data Center Construction Market Share by End-Use / Application (2017-2019)
8.3 by Regions
Table Asia-Pacific Data Center Construction Market (Million USD) by Regions (2017-2019)
Table Asia-Pacific Data Center Construction Market Share by Regions (2017-2019)
9 South America Market
9.1 by Type
Table South America Data Center Construction Market (Million USD) by Type (2017-2019)
Table South America Data Center Construction Market Share by Type (2017-2019)
9.2 by End-Use / Application
Table South America Data Center Construction Market (Million USD) by End-Use / Application (2017-2019)
Table South America Data Center Construction Market Share by End-Use / Application (2017-2019)
9.3 by Regions
Table South America Data Center Construction Market (Million USD) by Regions (2017-2019)
Table Middle East & Africa Data Center Construction Market Share by Regions (2017-2019)
10 Middle East & Africa Market
10.1 by Type
Table Middle East & Africa Data Center Construction Market (Million USD) by Type (2017-2019)
Table Middle East & Africa Data Center Construction Market Share by Type (2017-2019)
10.2 by End-Use / Application
Table Middle East & Africa Data Center Construction Market (Million USD) by End-Use / Application (2017-2019)
Table Middle East & Africa Data Center Construction Market Share by End-Use / Application (2017-2019)
10.3 by Regions
Table Middle East & Africa Data Center Construction Market (Million USD) by Regions (2017-2019)
Table Middle East & Africa Data Center Construction Market Share by Regions (2017-2019)
11 Market Forecast
11.1 Global Market Forecast (2020-2025)
Figure Global Data Center Construction Market (Million USD) and Growth Forecast (2020-2025)
Figure Global Data Center Construction Market Volume () and Growth Forecast (2020-2025)
11.2 Market Forecast by Regions (2020-2025)
Table Global Data Center Construction Market (Million USD) Forecast by Regions (2020-2025)
Table Global Data Center Construction Market Share Forecast by Regions (2020-2025)
Table Global Data Center Construction Market Volume () Forecast by Regions (2020-2025)
Table Global Data Center Construction Market Volume Share Forecast by Regions (2020-2025)
11.3 Market Forecast by Type (2020-2025)
Table Global Data Center Construction Market (Million USD) Forecast by Type (2020-2025)
Table Global Data Center ConstructionMarket Share by Forecast Type (2020-2025)
11.4 Market Forecast by End-Use / Application (2020-2025)
Table Global Data Center Construction Market (Million USD) Forecast by End-Use / Application (2020-2025)
Table Global Data Center Construction Market Share Forecast by End-Use / Application (2020-2025)
12 Key Manufacturers
12.Garmin AECOM
12.1.2 Company Overview
12.1.2 Product and End-User / Application
12.1.3 Business Data (Sales Revenue, Cost and Margin)
Table Sales Revenue, Volume, Price, Cost and Margin of AECOM
12.2 Arup Group
12.3 Corgan Associates
12.4 DPR Construction
12.5 Fluor
12.6 HDR Architecture
12.7 Holder Construction Group
12.8 ISG Construction
12.9 Jacobs Engineering Group
12.10 Jones Engineering
12.11 Nakano Corporation
12.12 Schneider Electric
12.13 SISK Group
12.14 Sweett Group
12.15 Turner Construction
13 Overview of Industry Development (COVID-19)
13.1 Analysis of Industry Development (COVID-19)
13.2 Industry Development Stage (COVID-19)
13.3 General Situation of Industry Development (COVID-19)
13.4 Analysis of Industry Development Characteristics (COVID-19)
14 Research Conclusion
The Intelligent Semantic Data Service Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive landscape, m...
The Data Annotation and Labeling Tool Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive landscape, m...
The Data Privacy and Digital Trust Consultancy Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive lan...
The Data Security and Protection Solution Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive landscap...
The Component-based Construction Systems Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive landscape...
The Individualized House Construction Services Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive lan...
The One-of-a-Kind Home Construction Services Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive lands...
The Construction Loan Servicing Software Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive landscape...
The Construction Funding Management Solutions Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive land...
The Exploratory Data Analysis (EDA) Tools Market is set to witness immense growth during the forecast period 2024-2031. This intelligence report offers an in-depth analysis of the market size, share, growth, opportunity, competitive landscap...